Shower waterproofing & tile underlayment
Schluter® Systems
Explore the work beneath the tile, from the shower pan and drain connection to uncoupling membranes and optional heated tile floors.
Bathrooms & showers
Shower preparation & waterproofing
We prepare the walls and floor, establish the slope to the drain, and waterproof the shower before tile installation. The layout determines how the waterproofing connects at the pan, curb or curbless entry, corners, niches, and fixtures.
Schluter KERDI is a sheet membrane we install beneath shower tile. We integrate it with the specified shower base and drain and seal seams, corners, and penetrations as part of the assembly.
Explore custom shower installationTile & stone floors
Floor preparation & DITRA
We check the subfloor condition and flatness before installation. Grinding, patching, or leveling can be included when needed.
Schluter DITRA is an uncoupling membrane for compatible tile or stone assemblies. It helps reduce stress from movement between the substrate and tile.
Explore tile and flooring installationHeated tile floors
Schluter DITRA-HEAT combines an uncoupling membrane with electric heating cables under eligible floors. If you want a heated bathroom floor, tell us which areas you’d like warmed when you request an estimate.
Ask about floor warmingRequest a project estimate
Send Jorge your project city, approximate dimensions, and a few photos. If you’ve picked your tile or flooring, include the size and product name.




